MHO Infrastructure

ShipLoader Upgrade

The completed shiploader for the Abotts Point Port terminal

Shiploader Upgrade

Abotts Point ShipLoade Upgrade and Maintanence

MHO Infrastructure was tasked with the upgrade of the Abotts Point Port Shiploader 2

Components:

  • Design
  • Removal of existing module
  • Replacement/Installation of new module
  • Revitilatition, upgrade and maintance of removed module as spare

Design

The design of the new ship loader involved

Shiploader Design

Construction

The construction of the new ship loader involved

Shiploader Construction

Commissioning

Commissioning the new module involved removal of the existing

Shiploader Commissioning

Revitilatition

The removed module was upgraded and restored to be provided as a spare for future installation.

Shiploader Revitilatition and Spares